Participating transmission owner per unit costs - 2021

Started: Mar 26, 2021

Leads
Phelim Tavares

The ISO Generator Interconnection Procedures (ISO Tariff Appendix Y Section 6) requires participating transmission owners to annually update and publish per unit costs for use during the current interconnection study cycle for estimating the cost of facilities required to interconnect generation.  Per unit costs are used to develop the cost for reliability and delivery network upgrades and participating transmission owner’s interconnection facilities. The ISO annually publishes draft per unit costs to its website, holds a stakeholder meeting and allows stakeholders to comment on the draft costs. The ISO publishes the final costs in the March to April time frame. The schedule for this annual process is located in Appendix 5 of the interconnection procedures.

Status

Development Decision Implementation Completed/Closed
Apr 1, 2021 Final per unit cost guides posted
Completed

Activities

Final cost guides


SCE 2021 Final Per Unit Cost Guide

VEA 2021 Final Per Unit Cost Guide

DCRT 2021 Final Per Unit Cost Guide

PG&E 2021 Final Per Unit Cost Guide

DSL 2021 Final Per Unit Cost Guide

GLW 2021 Final Per Unit Cost Guide

SDGE 2021 Final Per Unit Cost Guide

Web meeting


Draft cost guides


DCRT 2021 Draft Per Unit Cost Guide

DSL 2021 Draft Per Unit Cost Guide

GLW 2021 Draft Per Unit Cost Guide

PG&E 2021 Draft Per Unit Cost Guide

SCE 2021 Draft Per Unit Cost Guide

SDGE 2021 Draft Per Unit Cost Guide

VEA 2021 Draft Per Unit Cost Guide