Recent documents

Last 30 days

Date Title Document type Format Type
202404241630 04/24/2024 Pacific Gas & Electric comments on 2023-2024 Transmission planning process - Draft 2023-2024 Transmission Plan Comment/Response fileicon Process
202404241630 04/24/2024 Natural Resources Defense Council, Inc. comments on 2023-2024 Transmission planning process - Draft 2023-2024 Transmission Plan Comment/Response fileicon Process
202404240914 04/24/2024 Price Formation Enhancements - Feasibility Assessment and Straw Proposal - Apr 22, 2024 Papers, proposal, other documents fileicon Initiative
202404231701 04/23/2024 Presentation - Price Formation Enhancements - Apr 23, 2024 Agenda/Presentation fileicon Initiative
202404241121 04/24/2024 MSC Presentation - Price Formation Enhancements - Apr 24, 2024 Agenda/Presentation fileicon Initiative
202404241114 04/24/2024 Apr 8, 2022 Tariff Amendment Central Procurement Entities (ER22-1604) Papers, proposal, other documents fileicon Initiative
202404241119 04/24/2024 Jul 1, 2022 Order Accepting Central Procurement Entities Tariff Amendment (ER22-1604) Papers, proposal, other documents fileicon Initiative
202404240935 04/24/2024 MSC Presentation - Resource Adequacy Modeling and Program Design - Feb 23, 2024 Agenda/Presentation fileicon Initiative
202404231704 04/23/2024 Video - Price Formation Enhancements - Apr 23, 2024 Video fileicon Initiative
202404121542 04/12/2024 Issue Paper and Stakeholder Recommendations - Price Formation Enhancements - Rules for Bidding Above the Soft Offer Cap Papers, proposal, other documents fileicon Initiative
202404221657 04/22/2024 Presentation - Price Formation Enhancements - Apr 23, 2024 Agenda/Presentation fileicon Initiative
202404240918 04/24/2024 myself comments on 2023-2024 Transmission planning process - Draft 2023-2024 Transmission Plan Comment/Response fileicon Process
202404240906 04/24/2024 Northern California Power Agency comments on 2023-2024 Transmission planning process - Draft 2023-2024 Transmission Plan Comment/Response fileicon Process
202404240906 04/24/2024 Sonoma Clean Power Authority comments on 2023-2024 Transmission planning process - Draft 2023-2024 Transmission Plan Comment/Response fileicon Process
202404240905 04/24/2024 Fervo Energy Company comments on 2023-2024 Transmission planning process - Draft 2023-2024 Transmission Plan Comment/Response fileicon Process
202404240905 04/24/2024 Redwood Region Partners comments on 2023-2024 Transmission planning process - Draft 2023-2024 Transmission Plan Comment/Response fileicon Process
202404240904 04/24/2024 Equinor US LLC comments on 2023-2024 Transmission planning process - Draft 2023-2024 Transmission Plan Comment/Response fileicon Process
202404240904 04/24/2024 Transmission Agency of Northern California comments on 2023-2024 Transmission planning process - Draft 2023-2024 Transmission Plan Comment/Response fileicon Process
202404240904 04/24/2024 San Francisco Public Utilities Commission comments on 2023-2024 Transmission planning process - Draft 2023-2024 Transmission Plan Comment/Response fileicon Process
202404240903 04/24/2024 AES comments on 2023-2024 Transmission planning process - Draft 2023-2024 Transmission Plan Comment/Response fileicon Process
202404240858 04/24/2024 Golden State Clean Energy comments on 2023-2024 Transmission planning process - Draft 2023-2024 Transmission Plan Comment/Response fileicon Process
202404240856 04/24/2024 Bay Area Municipal Transmission Group (BAMx) comments on 2023-2024 Transmission planning process - Draft 2023-2024 Transmission Plan Comment/Response fileicon Process
202404240855 04/24/2024 Silicon Valley Power comments on 2023-2024 Transmission planning process - Draft 2023-2024 Transmission Plan Comment/Response fileicon Process
202404240853 04/24/2024 LS Power comments on 2023-2024 Transmission planning process - Draft 2023-2024 Transmission Plan Comment/Response fileicon Process
202404240853 04/24/2024 RWE Renewables comments on 2023-2024 Transmission planning process - Draft 2023-2024 Transmission Plan Comment/Response fileicon Process
202404240846 04/24/2024 County of Humboldt comments on 2023-2024 Transmission planning process - Draft 2023-2024 Transmission Plan Comment/Response fileicon Process
202404240843 04/24/2024 Smart Wires Inc. comments on 2023-2024 Transmission planning process - Draft 2023-2024 Transmission Plan Comment/Response fileicon Process
202404240840 04/24/2024 Southern California Edison comments on 2023-2024 Transmission planning process - Draft 2023-2024 Transmission Plan Comment/Response fileicon Process
202404240840 04/24/2024 CEERT and LEAP comments on 2023-2024 Transmission planning process - Draft 2023-2024 Transmission Plan Comment/Response fileicon Process
202404240839 04/24/2024 San Diego Gas & Electric comments on 2023-2024 Transmission planning process - Draft 2023-2024 Transmission Plan Comment/Response fileicon Process
202404240838 04/24/2024 LSA comments on 2023-2024 Transmission planning process - Draft 2023-2024 Transmission Plan Comment/Response fileicon Process
202404240836 04/24/2024 ACP-California comments on 2023-2024 Transmission planning process - Draft 2023-2024 Transmission Plan Comment/Response fileicon Process
202404240835 04/24/2024 Vineyard Offshore, LLC comments on 2023-2024 Transmission planning process - Draft 2023-2024 Transmission Plan Comment/Response fileicon Process
202404240834 04/24/2024 Offshore Wind California comments on 2023-2024 Transmission planning process - Draft 2023-2024 Transmission Plan Comment/Response fileicon Process
202404240834 04/24/2024 California Public Utilities Commission - Public Advocates Office comments on 2023-2024 Transmission planning process - Draft 2023-2024 Transmission Plan Comment/Response fileicon Process
202404240833 04/24/2024 California Wind Energy Association comments on 2023-2024 Transmission planning process - Draft 2023-2024 Transmission Plan Comment/Response fileicon Process
202404240833 04/24/2024 Tejon Ranch Company comments on 2023-2024 Transmission planning process - Draft 2023-2024 Transmission Plan Comment/Response fileicon Process
202404240833 04/24/2024 California Community Choice Association comments on 2023-2024 Transmission planning process - Draft 2023-2024 Transmission Plan Comment/Response fileicon Process
202404240828 04/24/2024 California Public Utilities Commission - Energy Division comments on 2023-2024 Transmission planning process - Draft 2023-2024 Transmission Plan Comment/Response fileicon Process
202404240813 04/24/2024 Presentation - FERC Order 881 - Managing Transmission Line Ratings - Phase 2 - Data Submission Working Group - Apr 24, 2024 Agenda/Presentation fileicon Initiative
202404230831 04/23/2024 California ISO - Department of Market Monitoring comments on Price formation enhancements - Issue paper and stakeholder recommendations Comment/Response fileicon Initiative
202404221443 04/22/2024 VistraCorp- Transmission Planning Enhancements - Apr 22, 2024 Agenda/Presentation fileicon Process
202404171307 04/17/2024 PNM Presentation - Greenhouse Gas Coordination - Apr 17, 2024 Agenda/Presentation fileicon Initiative
202404160956 04/16/2024 Vistra Presentation - Greenhouse Gas Coordination - Apr 17, 2024 Agenda/Presentation fileicon Initiative
202404171120 04/17/2024 WPTF Presentation - GHG Attribution Framework - Greenhouse Gas Coordination - Apr 17, 2024 Agenda/Presentation fileicon Initiative
202404170848 04/17/2024 CAISO Presentation - Greenhouse Gas Coordination - Apr 17, 2024 Agenda/Presentation fileicon Initiative
202404151555 04/15/2024 Agenda - Greenhouse Gas Coordination - Apr 17, 2024 Agenda/Presentation fileicon Initiative
202404151556 04/15/2024 Discussion Paper - Greenhouse Gas Coordination - Apr 15, 2024 Papers, proposal, other documents fileicon Initiative
202404161726 04/16/2024 WPTF GHG Attribution Framework Illustration - Greenhouse Gas Coordination - Apr 17, 2024 Papers, proposal, other documents fileicon Initiative
202404151557 04/15/2024 PG&E Presentation - Greenhouse Gas Coordination - Apr 17, 2024 Agenda/Presentation fileicon Initiative
202404221213 04/22/2024 Video - Greenhouse Gas Coordination - Apr 17, 2024 Video fileicon Initiative
202404151556 04/15/2024 WPTF Presentation - Greenhouse Gas Coordination - Apr 17, 2024 Agenda/Presentation fileicon Initiative
202404191717 04/19/2024 WPTF - CRR Enhancements - Apr 22, 2024 Agenda/Presentation fileicon Process
202404191715 04/19/2024 CDWR - CRR On Peak and Super Peak - Apr 22, 2024 Agenda/Presentation fileicon Process
202404191715 04/19/2024 CDWR - CRR On Peak and Super Peak - Apr 22, 2024 Agenda/Presentation fileicon Process
202404191714 04/19/2024 CDWR - Counter Flow CRR Allocations - Apr 22, 2024 Agenda/Presentation fileicon Process
202404192123 04/19/2024 PacifiCorp - Demand Response Request - Apr 22, 2024 Papers, proposal, other documents fileicon Process
202404192139 04/19/2024 Salt River Project comments on Price formation enhancements - Issue paper and stakeholder recommendations Comment/Response fileicon Initiative
202404192139 04/19/2024 Tacoma Power comments on Price formation enhancements - Issue paper and stakeholder recommendations Comment/Response fileicon Initiative
202404192138 04/19/2024 Six Cities comments on Price formation enhancements - Issue paper and stakeholder recommendations Comment/Response fileicon Initiative
202404192138 04/19/2024 The Energy Authority comments on Price formation enhancements - Issue paper and stakeholder recommendations Comment/Response fileicon Initiative
202404192138 04/19/2024 Terra-Gen, LLC comments on Price formation enhancements - Issue paper and stakeholder recommendations Comment/Response fileicon Initiative
202404192138 04/19/2024 Northern California Power Agency comments on Price formation enhancements - Issue paper and stakeholder recommendations Comment/Response fileicon Initiative
202404192138 04/19/2024 WPTF comments on Price formation enhancements - Issue paper and stakeholder recommendations Comment/Response fileicon Initiative
202404192138 04/19/2024 Seattle City Light comments on Price formation enhancements - Issue paper and stakeholder recommendations Comment/Response fileicon Initiative
202404192138 04/19/2024 Pacific Gas & Electric comments on Price formation enhancements - Issue paper and stakeholder recommendations Comment/Response fileicon Initiative
202404192138 04/19/2024 PacifiCorp comments on Price formation enhancements - Issue paper and stakeholder recommendations Comment/Response fileicon Initiative
202404192138 04/19/2024 Bonneville Power Administration comments on Price formation enhancements - Issue paper and stakeholder recommendations Comment/Response fileicon Initiative
202404192138 04/19/2024 Public Generating Pool comments on Price formation enhancements - Issue paper and stakeholder recommendations Comment/Response fileicon Initiative
202404192138 04/19/2024 Vistra Corp. comments on Price formation enhancements - Issue paper and stakeholder recommendations Comment/Response fileicon Initiative
202404192138 04/19/2024 Public Power Council comments on Price formation enhancements - Issue paper and stakeholder recommendations Comment/Response fileicon Initiative
202404192137 04/19/2024 Portland General Electric comments on Price formation enhancements - Issue paper and stakeholder recommendations Comment/Response fileicon Initiative
202404192137 04/19/2024 California Public Utilities Commission - Public Advocates Office comments on Price formation enhancements - Issue paper and stakeholder recommendations Comment/Response fileicon Initiative
202404192137 04/19/2024 San Diego Gas & Electric comments on Price formation enhancements - Issue paper and stakeholder recommendations Comment/Response fileicon Initiative
202404192137 04/19/2024 CESA comments on Price formation enhancements - Issue paper and stakeholder recommendations Comment/Response fileicon Initiative
202404192137 04/19/2024 Rev Renewables comments on Price formation enhancements - Issue paper and stakeholder recommendations Comment/Response fileicon Initiative
202404192130 04/19/2024 California ISO - Department of Market Monitoring comments on Penalty enhancements - demand response, investigation, and tolling - Straw Proposal for Penalty Enhancements: Demand Response, Investigation, and Tolling Comment/Response fileicon Initiative
202404192130 04/19/2024 City of Corona comments on Penalty enhancements - demand response, investigation, and tolling - Straw Proposal for Penalty Enhancements: Demand Response, Investigation, and Tolling Comment/Response fileicon Initiative
202404192130 04/19/2024 NV Energy comments on Penalty enhancements - demand response, investigation, and tolling - Straw Proposal for Penalty Enhancements: Demand Response, Investigation, and Tolling Comment/Response fileicon Initiative
202404192130 04/19/2024 PG&E comments on Penalty enhancements - demand response, investigation, and tolling - Straw Proposal for Penalty Enhancements: Demand Response, Investigation, and Tolling Comment/Response fileicon Initiative
202404192130 04/19/2024 Idaho Power Company comments on Penalty enhancements - demand response, investigation, and tolling - Straw Proposal for Penalty Enhancements: Demand Response, Investigation, and Tolling Comment/Response fileicon Initiative
202404192130 04/19/2024 California Efficiency + Demand Management Council comments on Penalty enhancements - demand response, investigation, and tolling - Straw Proposal for Penalty Enhancements: Demand Response, Investigation, and Tolling Comment/Response fileicon Initiative
202404192129 04/19/2024 Southern California Edison comments on Penalty enhancements - demand response, investigation, and tolling - Straw Proposal for Penalty Enhancements: Demand Response, Investigation, and Tolling Comment/Response fileicon Initiative
202404191430 04/19/2024 Presentation - Resource Adequacy Modeling and Program Design Working Group - April 23, 2024 Agenda/Presentation fileicon Initiative
202404031626 04/03/2024 LSE Survey Template - Resource Adequacy Modeling and Program Design Papers, proposal, other documents fileicon Initiative
202404191235 04/19/2024 Pacific Gas & Electric comments on Interconnection process enhancements 2023 - Final proposal Comment/Response fileicon Initiative
202404181650 04/18/2024 DMM - Congestion Revenue Rights - Apr 22, 2024 Agenda/Presentation fileicon Process
202404191049 04/19/2024 CLECA - RDRR minimum on time and fixed cost dispatch - Apr 22, 2024 Agenda/Presentation fileicon Process
202404191052 04/19/2024 Final Proposal - Reliability Demand Response Resource Minimum On Time Papers, proposal, other documents fileicon Process
202404191044 04/19/2024 Presentation - Annual Policy Roadmap Catalog Priotization Working Group #1 - Apr 22, 2024 Agenda/Presentation fileicon Process
202404181653 04/18/2024 Joint DR - Modified Proxy Demand Resource - Apr 22, 2024 Agenda/Presentation fileicon Process
202404181650 04/18/2024 Cal Advocates - Competitive Bidding - Apr 22, 2024 Agenda/Presentation fileicon Process
202404190802 04/19/2024 LSA comments on Interconnection process enhancements 2023 - Final proposal Comment/Response fileicon Initiative
202404190802 04/19/2024 MN8 Energy comments on Interconnection process enhancements 2023 - Final proposal Comment/Response fileicon Initiative
202404190802 04/19/2024 Amazon Energy LLC comments on Interconnection process enhancements 2023 - Final proposal Comment/Response fileicon Initiative
202404190802 04/19/2024 Independent Energy Producers Association comments on Interconnection process enhancements 2023 - Final proposal Comment/Response fileicon Initiative
202404190802 04/19/2024 Terra-Gen, LLC comments on Interconnection process enhancements 2023 - Final proposal Comment/Response fileicon Initiative
202404190802 04/19/2024 The Shell Companies comments on Interconnection process enhancements 2023 - Final proposal Comment/Response fileicon Initiative
202404190802 04/19/2024 Power Applications and Research Systems, Inc. comments on Interconnection process enhancements 2023 - Final proposal Comment/Response fileicon Initiative
202404190802 04/19/2024 Rev Renewables comments on Interconnection process enhancements 2023 - Final proposal Comment/Response fileicon Initiative
202404190802 04/19/2024 SEIA comments on Interconnection process enhancements 2023 - Final proposal Comment/Response fileicon Initiative
202404190801 04/19/2024 New Leaf Energy comments on Interconnection process enhancements 2023 - Final proposal Comment/Response fileicon Initiative
202404190801 04/19/2024 Q Cells USA Corp. comments on Interconnection process enhancements 2023 - Final proposal Comment/Response fileicon Initiative
202404190801 04/19/2024 AES comments on Interconnection process enhancements 2023 - Final proposal Comment/Response fileicon Initiative
202404190801 04/19/2024 ACP-California comments on Interconnection process enhancements 2023 - Final proposal Comment/Response fileicon Initiative
202404190801 04/19/2024 Capstone Power Development (US), LLC comments on Interconnection process enhancements 2023 - Final proposal Comment/Response fileicon Initiative
202404190801 04/19/2024 GreenGen Storage comments on Interconnection process enhancements 2023 - Final proposal Comment/Response fileicon Initiative
202404190800 04/19/2024 CESA comments on Interconnection process enhancements 2023 - Final proposal Comment/Response fileicon Initiative
202404190800 04/19/2024 ENGIE NA comments on Interconnection process enhancements 2023 - Final proposal Comment/Response fileicon Initiative
202404190800 04/19/2024 EDF-Renewables comments on Interconnection process enhancements 2023 - Final proposal Comment/Response fileicon Initiative
202404190800 04/19/2024 Six Cities comments on Interconnection process enhancements 2023 - Final proposal Comment/Response fileicon Initiative
202404190800 04/19/2024 California Public Utilities Commission comments on Interconnection process enhancements 2023 - Final proposal Comment/Response fileicon Initiative
202404190800 04/19/2024 Northern California Power Agency comments on Interconnection process enhancements 2023 - Final proposal Comment/Response fileicon Initiative
202404190800 04/19/2024 Intersect Power comments on Interconnection process enhancements 2023 - Final proposal Comment/Response fileicon Initiative
202404190800 04/19/2024 Vistra Corp. comments on Interconnection process enhancements 2023 - Final proposal Comment/Response fileicon Initiative
202404190800 04/19/2024 Clearway Energy Group comments on Interconnection process enhancements 2023 - Final proposal Comment/Response fileicon Initiative
202404190800 04/19/2024 San Diego Gas & Electric comments on Interconnection process enhancements 2023 - Final proposal Comment/Response fileicon Initiative
202404190759 04/19/2024 Southern California Edison comments on Interconnection process enhancements 2023 - Final proposal Comment/Response fileicon Initiative
202404190759 04/19/2024 California Community Choice Association comments on Interconnection process enhancements 2023 - Final proposal Comment/Response fileicon Initiative
202404190759 04/19/2024 Golden State Clean Energy comments on Interconnection process enhancements 2023 - Final proposal Comment/Response fileicon Initiative
202404181156 04/18/2024 Video - Draft Flexible Capacity Needs Assessment - Apr 15, 2024 Video fileicon Process
202404111659 04/11/2024 Draft Flexible Capacity Needs Assessment 2025 Papers, proposal, other documents fileicon Process
202404111634 04/11/2024 Presentation - Draft 2025 Flexibility Capacity Needs Assessment - Apr 15, 2024 Agenda/Presentation fileicon Process
202404120913 04/12/2024 2025 Flexible Capacity Needs Assessment Net Load Data Papers, proposal, other documents fileicon Process
202404181149 04/18/2024 ISO Responses to Comments - 20-Year Transmission Outlook - Jan 4, 2024 Papers, proposal, other documents fileicon Process
202404161156 04/16/2024 Presentation - 20 Year Transmission Outlook - Apr 18, 2024 Agenda/Presentation fileicon Process
202404151417 04/15/2024 Video - Penalty Enhancements: Demand Response, Investigation, and Tolling (PEDRIT) - Apr 3, 2024 Video fileicon Initiative
202403280901 03/28/2024 Straw Proposal - Penalty Enhancements - Demand Response, Investigation, and Tolling - Mar 28, 2024 Papers, proposal, other documents fileicon Initiative
202404011310 04/01/2024 Presentation - Penalty Enhancements: Demand Response, Investigation, and Tolling - April 3, 2024 Agenda/Presentation fileicon Initiative
202404151241 04/15/2024 Video - Price Formation Enhancements - Apr 8, 2024 Video fileicon Initiative
202404081622 04/08/2024 Revised Draft Tariff Language - Extended Day-Ahead Market Access Charge Papers, proposal, other documents fileicon Initiative
202404120850 04/12/2024 Video - Extended Day-Ahead Market Access Charge - Apr 10, 2024 Video fileicon Initiative
202404111644 04/11/2024 North Gila-Imperial Valley 2 500kV Line Project Sponsor Selection Report - Final Report Agenda/Presentation fileicon Process
202404101307 04/10/2024 Video - Interconnection Process Enhancements Track 2: Final Proposal - Apr 4, 2024 Video fileicon Initiative
202403290746 03/29/2024 Final Proposal - Interconnection Process Enhancements 2023 Track 2 Papers, proposal, other documents fileicon Initiative
202403281621 03/28/2024 Final Proposal Cluster Schedule - Interconnection Process Enhancements 2023 Track 2 Papers, proposal, other documents fileicon Initiative
202404030914 04/03/2024 Presentation - Interconnection Process Enhancements 2023 Track 2 - Apr 4, 2024 Agenda/Presentation fileicon Initiative
202404090802 04/09/2024 ISO Responses to Comments - 2023-2024 Transmission Planning Process - Nov 16, 2023 Papers, proposal, other documents fileicon Process
202404080826 04/08/2024 Presentation - Price Formation Enhancement - Apr 8, 2024 Agenda/Presentation fileicon Initiative
202404011102 04/01/2024 Appendix E - Draft 2023-2024 TransmissionPlan Papers, proposal, other documents fileicon Process
202404011059 04/01/2024 Appendix H - Draft 2023-2024 Transmission Plan Papers, proposal, other documents fileicon Process
202404011104 04/01/2024 Draft 2023-2024 Transmission Plan Papers, proposal, other documents fileicon Process
202404051429 04/05/2024 Presentation - 2023-2024 Transmission Planning Process - Apr 9, 2024 Agenda/Presentation fileicon Process
202404011101 04/01/2024 Appendix D - Draft 2023-2024 TransmissionPlan Papers, proposal, other documents fileicon Process
202404011100 04/01/2024 Appendix G - Draft 2023-2024 Transmission Plan Papers, proposal, other documents fileicon Process
202404011100 04/01/2024 Appendix A - Draft 2023-2024 Transmission Plan Papers, proposal, other documents fileicon Process
202404011101 04/01/2024 Appendix C - Draft 2023-2024 TransmissionPlan Papers, proposal, other documents fileicon Process
202404011059 04/01/2024 Appendix I - Draft 2023-2024 Transmission Plan Papers, proposal, other documents fileicon Process
202404011100 04/01/2024 Appendix B - Draft 2023-2024 Transmission Plan Papers, proposal, other documents fileicon Process
202404011102 04/01/2024 Appendix F - Draft 2023-2024 TransmissionPlan Papers, proposal, other documents fileicon Process
202404081333 04/08/2024 Presentation – Final 2025 and 2029 LCR LA Basin and San Diego-Imperial Valley Local Areas Agenda/Presentation fileicon Process
202404081332 04/08/2024 Presentation – Final 2025 and 2029 LCR Stockton Local Area Agenda/Presentation fileicon Process
202404081330 04/08/2024 Presentation – Final 2025 and 2029 LCR NCNB Local Area Agenda/Presentation fileicon Process
202404081331 04/08/2024 Presentation – Final 2025 and 2029 LCR Humboldt Local Area Agenda/Presentation fileicon Process
202404081332 04/08/2024 Presentation – Final 2025 and 2029 LCR Kern Local Area Agenda/Presentation fileicon Process
202404081329 04/08/2024 Overall Summary of Findings - 2025 and 2029 Local Capacity Requirements - Apr 11, 2024 Papers, proposal, other documents fileicon Process
202404081331 04/08/2024 Presentation – Final 2025 and 2029 LCR Fresno Local Area Agenda/Presentation fileicon Process
202404081329 04/08/2024 Agenda – 2025 and 2029 Local Capacity Requirements - Apr 11, 2024 Agenda/Presentation fileicon Process
202404081332 04/08/2024 Presentation – Final 2025 and 2029 LCR Sierra Local Area Agenda/Presentation fileicon Process
202404081331 04/08/2024 Presentation – Final 2025 and 2029 LCR Bay Area Local Area Agenda/Presentation fileicon Process
202404081333 04/08/2024 Presentation – Final 2025 and 2029 LCR Big Creek-Ventura Local Area Agenda/Presentation fileicon Process
202404081334 04/08/2024 Presentation – Final 2025 and 2029 LCR San Diego Non-Bulk Sub-areas Agenda/Presentation fileicon Process
202404081110 04/08/2024 Revised Schedule - 2022-2023 Transmission Planning Process - Phase 3 Sequence Papers, proposal, other documents fileicon Process
202404080715 04/08/2024 Presentation - Price Formation Enhancement Workshop - Apr 8, 2024 Agenda/Presentation fileicon Initiative
202404041152 04/04/2024 Presentation - CAISO Policy Initiatives Catalog and Roadmap - Mar 18, 2024 Papers, proposal, other documents fileicon Process
202404041137 04/04/2024 California Public Utilities Commission comments on Annual policy initiatives roadmap process - 2024 - Discretionary policy initiatives catalog submission Comment/Response fileicon Process
202404041059 04/04/2024 WPTF comments on Greenhouse gas coordination working group - March 14, 2024 Working Group Comment/Response fileicon Initiative
202404041059 04/04/2024 Six Cities comments on Greenhouse gas coordination working group - March 14, 2024 Working Group Comment/Response fileicon Initiative
202404031911 04/03/2024 Center for Resource Solutions (CRS) comments on Greenhouse gas coordination working group - March 14, 2024 Working Group Comment/Response fileicon Initiative
202404031911 04/03/2024 Western Resource Advocates comments on Greenhouse gas coordination working group - March 14, 2024 Working Group Comment/Response fileicon Initiative
202404031911 04/03/2024 Sacramento Municipal Utility District comments on Greenhouse gas coordination working group - March 14, 2024 Working Group Comment/Response fileicon Initiative
202404031911 04/03/2024 PacifiCorp comments on Greenhouse gas coordination working group - March 14, 2024 Working Group Comment/Response fileicon Initiative
202404031911 04/03/2024 Bonneville Power Administration comments on Greenhouse gas coordination working group - March 14, 2024 Working Group Comment/Response fileicon Initiative
202404031911 04/03/2024 NV Energy comments on Greenhouse gas coordination working group - March 14, 2024 Working Group Comment/Response fileicon Initiative
202404031911 04/03/2024 Public Generating Pool comments on Greenhouse gas coordination working group - March 14, 2024 Working Group Comment/Response fileicon Initiative
202404031911 04/03/2024 PGE comments on Greenhouse gas coordination working group - March 14, 2024 Working Group Comment/Response fileicon Initiative
202404031911 04/03/2024 Salt River Project comments on Greenhouse gas coordination working group - March 14, 2024 Working Group Comment/Response fileicon Initiative
202404031245 04/03/2024 Survey - Interconnection Process Enhancements Track 2 Stakeholder Process Papers, proposal, other documents fileicon Initiative
202404031614 04/03/2024 Constraint Mapping with Transmission Plan Deliverability Allocated Papers, proposal, other documents fileicon Initiative
202404031613 04/03/2024 Interconnection Area Constraint Zones Papers, proposal, other documents fileicon Initiative
202404031531 04/03/2024 Presentation - Transmission Service and Market Scheduling Priorities Phase 2 Training (Daily Process) - April 4, 2024 Agenda/Presentation fileicon Initiative
202403051103 03/05/2024 Presentation - Draft 2025 and 2029 LCR Big Creek - Ventura Local Area - March 6, 2024 Agenda/Presentation fileicon Process
202403041414 03/04/2024 Overall Summary of Findings - Draft 2025 and 2029 Local Capacity Requirement - March 6, 2024 Papers, proposal, other documents fileicon Process
202403041413 03/04/2024 Agenda - 2025 and 2029 Local Capacity Requirements - March 6, 2024 Agenda/Presentation fileicon Process
202403041421 03/04/2024 Presentation - Draft 2025 and 2029 LCR Fresno Local Area - March 6, 2024 Agenda/Presentation fileicon Process
202403041429 03/04/2024 Presentation - Draft 2025 and 2029 LCR San Diego Non-Bulk Sub-Areas - March 6, 2024 Agenda/Presentation fileicon Process
202403041415 03/04/2024 Presentation - Draft 2025 and 2029 LCR NCNB Local Area - March 6, 2024 Agenda/Presentation fileicon Process
202403041428 03/04/2024 Presentation - Draft 2025 and 2029 LCR LA Basin and San Diego - Imperial Valley Local Areas - March 6, 2024 Agenda/Presentation fileicon Process
202403041420 03/04/2024 Presentation - Draft 2025 and 2029 LCR Humboldt Local Area - March 6, 2024 Agenda/Presentation fileicon Process
202404031205 04/03/2024 ISO Responses to Comments – Draft 2025 and 2029 Local Capacity Requirement Study Results Papers, proposal, other documents fileicon Process
202404031205 04/03/2024 Draft 2029 Long-Term Local Capacity Technical Report Papers, proposal, other documents fileicon Process
202404021414 04/02/2024 Attachment A – List of Physical Resources Accounted for in the 2025 and 2029 Local Capacity Technical Studies Papers, proposal, other documents fileicon Process
202404031205 04/03/2024 Draft 2025 Local Capacity Technical Report Papers, proposal, other documents fileicon Process
202404020742 04/02/2024 Annual Policy Initiative Proposal - Shaping Factor- CPUC Energy Division - Apr 02, 2024 Papers, proposal, other documents fileicon Process
202404020740 04/02/2024 Annual Policy Initiative Proposal - RAAIM - CPUC Energy Division - Apr 02, 2024 Papers, proposal, other documents fileicon Process
202404020739 04/02/2024 Annual Policy Initiative Proposal Liquidity of bilateral indices - CPUC Energy Division - Apr 02, 2024 Papers, proposal, other documents fileicon Process
202404021434 04/02/2024 Apr 2, 2024 Informational Filling Effective Date - Rules of Conduct Enhancements (ER24-872) Papers, proposal, other documents fileicon Initiative
202403280920 03/28/2024 California Public Utilities Commission - Public Advocates Office comments on Resource adequacy modeling and program design - March 13, 2024 working group Comment/Response fileicon Initiative
202403280920 03/28/2024 Alliance for Retail Energy Markets comments on Resource adequacy modeling and program design - March 13, 2024 working group Comment/Response fileicon Initiative
202403280920 03/28/2024 San Diego Gas & Electric comments on Resource adequacy modeling and program design - March 13, 2024 working group Comment/Response fileicon Initiative
202403280919 03/28/2024 Middle River Power, LLC comments on Resource adequacy modeling and program design - March 13, 2024 working group Comment/Response fileicon Initiative
202403280919 03/28/2024 Microsoft comments on Resource adequacy modeling and program design - March 13, 2024 working group Comment/Response fileicon Initiative
202403280918 03/28/2024 Pacific Gas & Electric comments on Resource adequacy modeling and program design - March 13, 2024 working group Comment/Response fileicon Initiative
202403280918 03/28/2024 Six Cities comments on Resource adequacy modeling and program design - March 13, 2024 working group Comment/Response fileicon Initiative
202403280917 03/28/2024 Northern California Power Agency comments on Resource adequacy modeling and program design - March 13, 2024 working group Comment/Response fileicon Initiative
202403280917 03/28/2024 California Community Choice Association comments on Resource adequacy modeling and program design - March 13, 2024 working group Comment/Response fileicon Initiative
202403280917 03/28/2024 California Department of Water Resources comments on Resource adequacy modeling and program design - March 13, 2024 working group Comment/Response fileicon Initiative
202403271445 03/27/2024 California Public Utilities Commission comments on Price formation enhancements - Scarcity sprint Comment/Response fileicon Initiative
202403250758 03/25/2024 Public Generating Pool comments on Price formation enhancements - Working group session 15 - Storage/FERC 831 Comment/Response fileicon Initiative
202403221701 03/22/2024 Salt River Project comments on Price formation enhancements - Working group session 15 - Storage/FERC 831 Comment/Response fileicon Initiative
202403221647 03/22/2024 WPTF comments on Price formation enhancements - Working group session 15 - Storage/FERC 831 Comment/Response fileicon Initiative
202403221643 03/22/2024 PacifiCorp comments on Price formation enhancements - Working group session 15 - Storage/FERC 831 Comment/Response fileicon Initiative
202403221643 03/22/2024 California Community Choice Association comments on Price formation enhancements - Working group session 15 - Storage/FERC 831 Comment/Response fileicon Initiative
202403221643 03/22/2024 California ISO - Department of Market Monitoring comments on Price formation enhancements - Working group session 15 - Storage/FERC 831 Comment/Response fileicon Initiative
202403221642 03/22/2024 Pacific Gas & Electric comments on Price formation enhancements - Working group session 15 - Storage/FERC 831 Comment/Response fileicon Initiative
202403221642 03/22/2024 Portland General Electric comments on Price formation enhancements - Working group session 15 - Storage/FERC 831 Comment/Response fileicon Initiative
202403221642 03/22/2024 Bonneville Power Administration comments on Price formation enhancements - Working group session 15 - Storage/FERC 831 Comment/Response fileicon Initiative
202403221642 03/22/2024 Terra-Gen, LLC comments on Price formation enhancements - Working group session 15 - Storage/FERC 831 Comment/Response fileicon Initiative
202403221642 03/22/2024 Calpine comments on Price formation enhancements - Working group session 15 - Storage/FERC 831 Comment/Response fileicon Initiative
202403221642 03/22/2024 Seattle City Light comments on Price formation enhancements - Working group session 15 - Storage/FERC 831 Comment/Response fileicon Initiative
202403221642 03/22/2024 Rev Renewables comments on Price formation enhancements - Working group session 15 - Storage/FERC 831 Comment/Response fileicon Initiative
202403221642 03/22/2024 Southern California Edison comments on Price formation enhancements - Working group session 15 - Storage/FERC 831 Comment/Response fileicon Initiative
202403221642 03/22/2024 CESA comments on Price formation enhancements - Working group session 15 - Storage/FERC 831 Comment/Response fileicon Initiative
202403221642 03/22/2024 Vistra Corp. comments on Price formation enhancements - Working group session 15 - Storage/FERC 831 Comment/Response fileicon Initiative
202403221642 03/22/2024 Six Cities comments on Price formation enhancements - Working group session 15 - Storage/FERC 831 Comment/Response fileicon Initiative
202401301526 01/30/2024 Updated Price Formation Enhancements Working Group Schedule 2024 Papers, proposal, other documents fileicon Initiative
202403220808 03/22/2024 Form Energy, Inc. comments on Local capacity requirements process - 2025 - Draft 2025 and 2029 LCR Study Results Comment/Response fileicon Process
202403220808 03/22/2024 California Community Choice Association comments on Local capacity requirements process - 2025 - Draft 2025 and 2029 LCR Study Results Comment/Response fileicon Process
202403201129 03/20/2024 Video - Extended Day-Ahead Market Access Charge - Mar 15, 2024 Video fileicon Initiative
202403131305 03/13/2024 Draft Tariff Language - Extended Day-Ahead Market Access Charge - Mar 15, 2024 Papers, proposal, other documents fileicon Initiative
202403131311 03/13/2024 Presentation - Extended Day-Ahead Market Access Charge - Mar 15, 2024 Agenda/Presentation fileicon Initiative
202403200817 03/20/2024 Salt River Project comments on Gas resource management working group - Working group 8 Comment/Response fileicon Initiative
202403200816 03/20/2024 NV Energy comments on Gas resource management working group - Working group 8 Comment/Response fileicon Initiative
202403200815 03/20/2024 PacifiCorp comments on Gas resource management working group - Working group 8 Comment/Response fileicon Initiative
202403190758 03/19/2024 Work Streams - Greenhouse Gas Coordination Papers, proposal, other documents fileicon Initiative
202403191109 03/19/2024 Video - Greenhouse Gas Coordination Working Group - Mar 14, 2024 Video fileicon Initiative
202403121624 03/12/2024 Presentation - Greenhouse Gas Coordination - Mar 14, 2024 Agenda/Presentation fileicon Initiative
202403121639 03/12/2024 Presentation - Resource Adequacy Modeling and Program Design Working Group - Mar 13, 2024 Agenda/Presentation fileicon Initiative
202403151443 03/15/2024 Video - Resource Adequacy Modeling and Program Design Working Group - Mar 13, 2024 Video fileicon Initiative
202403151027 03/15/2024 MRP Presentation - Resource Adequacy Modeling and Program Design - Mar 13, 2024 Agenda/Presentation fileicon Initiative
202402131008 02/13/2024 Video - Price Formation Enhancements Workshop - Feb 12, 2024 Video fileicon Initiative
202402091252 02/09/2024 Presentation - Price Formation Enhancement Workshop - Feb 12, 2024 Agenda/Presentation fileicon Initiative
202403150832 03/15/2024 Video - Resource Adequacy Modeling and Program Design - Feb 13, 2024 Video fileicon Initiative
202402131030 02/13/2024 Presentation - Resource Adequacy Modeling and Program Design Working Group - Feb 13, 2024 Agenda/Presentation fileicon Initiative
202403131402 03/13/2024 Presentation - Resource Sufficiency Evaluaton Enhancements Phase 2, Track 2 Refresher Training Agenda/Presentation fileicon Initiative
202403120827 03/12/2024 Presentation - Price Formation Enhancements Working Group - Mar 12, 2024 Agenda/Presentation fileicon Initiative
202403131113 03/13/2024 Video - Price Formation Enhancements Working Group - Mar 8, 2024 Video fileicon Initiative
202402201431 02/20/2024 Presentation - Price Formation Enhancement - Feb 21, 2024 Agenda/Presentation fileicon Initiative
202402231750 02/23/2024 Video - Price Formation Enhancements Working Group - Feb 21, 2024 Video fileicon Initiative
202403141253 03/14/2024 Video - Resource Sufficiency Evaluation Enhancements Phase 2, Track 2 Refresher Training Video fileicon Initiative
202403141217 03/14/2024 Six Cities comments on 2024-2025 Transmission planning process - Draft Study Plan and 2/28 meeting Comment/Response fileicon Process
202403141217 03/14/2024 Pacific Gas & Electric comments on 2024-2025 Transmission planning process - Draft Study Plan and 2/28 meeting Comment/Response fileicon Process
202403141133 03/14/2024 ENGIE NA comments on 2024-2025 Transmission planning process - Draft Study Plan and 2/28 meeting Comment/Response fileicon Process
202403141022 03/14/2024 ACP-California comments on 2024-2025 Transmission planning process - Draft Study Plan and 2/28 meeting Comment/Response fileicon Process
202403141022 03/14/2024 EDF Renewables comments on 2024-2025 Transmission planning process - Draft Study Plan and 2/28 meeting Comment/Response fileicon Process
202403141022 03/14/2024 GridLiance West comments on 2024-2025 Transmission planning process - Draft Study Plan and 2/28 meeting Comment/Response fileicon Process
202403141021 03/14/2024 Grid United LLC comments on 2024-2025 Transmission planning process - Draft Study Plan and 2/28 meeting Comment/Response fileicon Process
202403141021 03/14/2024 Kern to Southland Energy Link LLC comments on 2024-2025 Transmission planning process - Draft Study Plan and 2/28 meeting Comment/Response fileicon Process
202403141021 03/14/2024 San Diego Gas & Electric comments on 2024-2025 Transmission planning process - Draft Study Plan and 2/28 meeting Comment/Response fileicon Process
202403141020 03/14/2024 Bay Area Municipal Transmission Group (BAMx) comments on 2024-2025 Transmission planning process - Draft Study Plan and 2/28 meeting Comment/Response fileicon Process
202403141020 03/14/2024 East Bay Community Energy comments on 2024-2025 Transmission planning process - Draft Study Plan and 2/28 meeting Comment/Response fileicon Process
202403141020 03/14/2024 The WATT Coalition comments on 2024-2025 Transmission planning process - Draft Study Plan and 2/28 meeting Comment/Response fileicon Process
202403141019 03/14/2024 LSA comments on 2024-2025 Transmission planning process - Draft Study Plan and 2/28 meeting Comment/Response fileicon Process
202403141018 03/14/2024 Northern California Power Agency comments on 2024-2025 Transmission planning process - Draft Study Plan and 2/28 meeting Comment/Response fileicon Process
202403141018 03/14/2024 Golden State Clean Energy comments on 2024-2025 Transmission planning process - Draft Study Plan and 2/28 meeting Comment/Response fileicon Process
202403141018 03/14/2024 TransWest Express LLC comments on 2024-2025 Transmission planning process - Draft Study Plan and 2/28 meeting Comment/Response fileicon Process
202403141017 03/14/2024 California Western Grid Development, LLC comments on 2024-2025 Transmission planning process - Draft Study Plan and 2/28 meeting Comment/Response fileicon Process
202403141017 03/14/2024 Silicon Valley Power comments on 2024-2025 Transmission planning process - Draft Study Plan and 2/28 meeting Comment/Response fileicon Process
202403141016 03/14/2024 California Public Utilities Commission comments on 2024-2025 Transmission planning process - Draft Study Plan and 2/28 meeting Comment/Response fileicon Process
202403141016 03/14/2024 Natural Resources Defense Council, Inc. comments on 2024-2025 Transmission planning process - Draft Study Plan and 2/28 meeting Comment/Response fileicon Process
202403101049 03/10/2024 WPTF comments on Greenhouse gas coordination working group - February 22, 2024 working group Comment/Response fileicon Initiative
202403081534 03/08/2024 Western Resource Advocates comments on Greenhouse gas coordination working group - February 22, 2024 working group Comment/Response fileicon Initiative
202403080845 03/08/2024 Center for Resource Solutions (CRS) comments on Greenhouse gas coordination working group - February 22, 2024 working group Comment/Response fileicon Initiative
202403080845 03/08/2024 PGE comments on Greenhouse gas coordination working group - February 22, 2024 working group Comment/Response fileicon Initiative
202403080845 03/08/2024 Salt River Project comments on Greenhouse gas coordination working group - February 22, 2024 working group Comment/Response fileicon Initiative
202403080845 03/08/2024 Bonneville Power Administration comments on Greenhouse gas coordination working group - February 22, 2024 working group Comment/Response fileicon Initiative
202403080845 03/08/2024 Six Cities comments on Greenhouse gas coordination working group - February 22, 2024 working group Comment/Response fileicon Initiative
202403080845 03/08/2024 Public Generating Pool comments on Greenhouse gas coordination working group - February 22, 2024 working group Comment/Response fileicon Initiative
202403080845 03/08/2024 PacifiCorp comments on Greenhouse gas coordination working group - February 22, 2024 working group Comment/Response fileicon Initiative
202403080844 03/08/2024 Pacific Gas & Electric comments on Greenhouse gas coordination working group - February 22, 2024 working group Comment/Response fileicon Initiative
202403080844 03/08/2024 Puget Sound Energy comments on Greenhouse gas coordination working group - February 22, 2024 working group Comment/Response fileicon Initiative
202403071540 03/07/2024 Summary of 2024 Annual Catalog Submissions Papers, proposal, other documents fileicon Process
202403071355 03/07/2024 Video - Gas Resource Management Working Group - Mar 5, 2024 Video fileicon Initiative
202403050923 03/05/2024 Presentation - Gas Resource Management - Mar 5, 2024 Agenda/Presentation fileicon Initiative
202403061319 03/06/2024 WEIM Body of State Regulators comments on Annual policy initiatives roadmap process - 2024 - Discretionary policy initiatives catalog submission Comment/Response fileicon Process
202403051103 03/05/2024 Presentation - Draft 2025 and 2029 LCR Bay Area Local Area - March 6, 2024 Agenda/Presentation fileicon Process
202403041425 03/04/2024 Presentation - Draft 2025 and 2029 LCR Stockton Local Area - March 6, 2024 Agenda/Presentation fileicon Process
202403041424 03/04/2024 Presentation - Draft 2025 and 2029 LCR Sierra Local Area - March 6, 2024 Agenda/Presentation fileicon Process
202403041426 03/04/2024 Presentation - Draft 2025 and 2029 LCR Kern Local Area - March 6, 2024 Agenda/Presentation fileicon Process
202403011637 03/01/2024 IPP and Marketers Sector comments on Annual policy initiatives roadmap process - 2024 - Discretionary policy initiatives catalog submission Comment/Response fileicon Process
202402291313 02/29/2024 Regional Issues Forum fileicon Process
202403011308 03/01/2024 GSW comments on Interconnection process enhancements 2023 - Draft Final Proposal Comment/Response fileicon Initiative
202403011148 03/01/2024 EDF-Renewables comments on Interconnection process enhancements 2023 - Draft Final Proposal Comment/Response fileicon Initiative
202403010854 03/01/2024 Vistra Corp. comments on Interconnection process enhancements 2023 - Draft Final Proposal Comment/Response fileicon Initiative
202403010853 03/01/2024 Upstream comments on Interconnection process enhancements 2023 - Draft Final Proposal Comment/Response fileicon Initiative
202403010852 03/01/2024 Terra-Gen, LLC comments on Interconnection process enhancements 2023 - Draft Final Proposal Comment/Response fileicon Initiative
202403010852 03/01/2024 Strata Clean Energy comments on Interconnection process enhancements 2023 - Draft Final Proposal Comment/Response fileicon Initiative
202403010851 03/01/2024 Southern California Edison comments on Interconnection process enhancements 2023 - Draft Final Proposal Comment/Response fileicon Initiative
202403010850 03/01/2024 Six Cities comments on Interconnection process enhancements 2023 - Draft Final Proposal Comment/Response fileicon Initiative
202403010850 03/01/2024 Shell Energy comments on Interconnection process enhancements 2023 - Draft Final Proposal Comment/Response fileicon Initiative
202403010849 03/01/2024 SEIA comments on Interconnection process enhancements 2023 - Draft Final Proposal Comment/Response fileicon Initiative
202403010848 03/01/2024 San Diego Gas & Electric comments on Interconnection process enhancements 2023 - Draft Final Proposal Comment/Response fileicon Initiative
202403010846 03/01/2024 Rev Renewables comments on Interconnection process enhancements 2023 - Draft Final Proposal Comment/Response fileicon Initiative
202403010845 03/01/2024 Recurrent Energy comments on Interconnection process enhancements 2023 - Draft Final Proposal Comment/Response fileicon Initiative
202403010845 03/01/2024 Q Cells USA Corp. comments on Interconnection process enhancements 2023 - Draft Final Proposal Comment/Response fileicon Initiative
202403010844 03/01/2024 Prologis comments on Interconnection process enhancements 2023 - Draft Final Proposal Comment/Response fileicon Initiative
202403010843 03/01/2024 Power Flow Development, LLC comments on Interconnection process enhancements 2023 - Draft Final Proposal Comment/Response fileicon Initiative
202403010842 03/01/2024 Power Applications and Research Systems, Inc. comments on Interconnection process enhancements 2023 - Draft Final Proposal Comment/Response fileicon Initiative
202403010841 03/01/2024 Pacific Gas & Electric comments on Interconnection process enhancements 2023 - Draft Final Proposal Comment/Response fileicon Initiative
202403010841 03/01/2024 Northern California Power Agency comments on Interconnection process enhancements 2023 - Draft Final Proposal Comment/Response fileicon Initiative
202403010840 03/01/2024 NextEra Energy Resources comments on Interconnection process enhancements 2023 - Draft Final Proposal Comment/Response fileicon Initiative
202403010839 03/01/2024 New Leaf Energy comments on Interconnection process enhancements 2023 - Draft Final Proposal Comment/Response fileicon Initiative
202403010838 03/01/2024 MN8 Energy comments on Interconnection process enhancements 2023 - Draft Final Proposal Comment/Response fileicon Initiative
202403010838 03/01/2024 Middle River Power, LLC comments on Interconnection process enhancements 2023 - Draft Final Proposal Comment/Response fileicon Initiative
202403010837 03/01/2024 LSA comments on Interconnection process enhancements 2023 - Draft Final Proposal Comment/Response fileicon Initiative
202403010837 03/01/2024 Leeward Renewable Energy comments on Interconnection process enhancements 2023 - Draft Final Proposal Comment/Response fileicon Initiative
202403010836 03/01/2024 Intersect Power comments on Interconnection process enhancements 2023 - Draft Final Proposal Comment/Response fileicon Initiative
202403010835 03/01/2024 Independent Energy Producers Association comments on Interconnection process enhancements 2023 - Draft Final Proposal Comment/Response fileicon Initiative
202403010834 03/01/2024 Hecate Grid LLC comments on Interconnection process enhancements 2023 - Draft Final Proposal Comment/Response fileicon Initiative
202403010834 03/01/2024 Golden State Clean Energy comments on Interconnection process enhancements 2023 - Draft Final Proposal Comment/Response fileicon Initiative
202403010833 03/01/2024 esVolta comments on Interconnection process enhancements 2023 - Draft Final Proposal Comment/Response fileicon Initiative
202403010832 03/01/2024 ENGIE NA comments on Interconnection process enhancements 2023 - Draft Final Proposal Comment/Response fileicon Initiative
202403010832 03/01/2024 Clearway Energy Group comments on Interconnection process enhancements 2023 - Draft Final Proposal Comment/Response fileicon Initiative
202403010830 03/01/2024 CESA comments on Interconnection process enhancements 2023 - Draft Final Proposal Comment/Response fileicon Initiative
202403010830 03/01/2024 Capstone Power Development (US), LLC comments on Interconnection process enhancements 2023 - Draft Final Proposal Comment/Response fileicon Initiative
202403010829 03/01/2024 California Wind Energy Association comments on Interconnection process enhancements 2023 - Draft Final Proposal Comment/Response fileicon Initiative
202403010829 03/01/2024 California Public Utilities Commission - Public Advocates Office comments on Interconnection process enhancements 2023 - Draft Final Proposal Comment/Response fileicon Initiative
202403010828 03/01/2024 California Community Choice Association comments on Interconnection process enhancements 2023 - Draft Final Proposal Comment/Response fileicon Initiative
202403010827 03/01/2024 Bay Area Municipal Transmission Group (BAMx) comments on Interconnection process enhancements 2023 - Draft Final Proposal Comment/Response fileicon Initiative
202403010827 03/01/2024 AES comments on Interconnection process enhancements 2023 - Draft Final Proposal Comment/Response fileicon Initiative
202403010826 03/01/2024 ACP-California comments on Interconnection process enhancements 2023 - Draft Final Proposal Comment/Response fileicon Initiative
202403010755 03/01/2024 California ISO - Department of Market Monitoring comments on Annual policy initiatives roadmap process - 2024 - Discretionary policy initiatives catalog submission Comment/Response fileicon Process
202403010754 03/01/2024 WPTF comments on Annual policy initiatives roadmap process - 2024 - Discretionary policy initiatives catalog submission Comment/Response fileicon Process
202402291637 02/29/2024 Salt River Project comments on Annual policy initiatives roadmap process - 2024 - Discretionary policy initiatives catalog submission Comment/Response fileicon Process
202402291307 02/29/2024 NV Energy comments on Annual policy initiatives roadmap process - 2024 - Discretionary policy initiatives catalog submission Comment/Response fileicon Process
202402290840 02/29/2024 Middle River Power, LLC comments on Annual policy initiatives roadmap process - 2024 - Discretionary policy initiatives catalog submission Comment/Response fileicon Process
202402290840 02/29/2024 Bonneville Power Administration comments on Annual policy initiatives roadmap process - 2024 - Discretionary policy initiatives catalog submission Comment/Response fileicon Process
202402290840 02/29/2024 Bay Area Municipal Transmission Group (BAMx) comments on Annual policy initiatives roadmap process - 2024 - Discretionary policy initiatives catalog submission Comment/Response fileicon Process
202402290840 02/29/2024 Joint Storage Stakeholders comments on Annual policy initiatives roadmap process - 2024 - Discretionary policy initiatives catalog submission Comment/Response fileicon Process
202402290839 02/29/2024 California Public Utilities Commission - Public Advocates Office comments on Annual policy initiatives roadmap process - 2024 - Discretionary policy initiatives catalog submission Comment/Response fileicon Process
202402290839 02/29/2024 Idaho Power Company comments on Annual policy initiatives roadmap process - 2024 - Discretionary policy initiatives catalog submission Comment/Response fileicon Process
202402290839 02/29/2024 LSA comments on Annual policy initiatives roadmap process - 2024 - Discretionary policy initiatives catalog submission Comment/Response fileicon Process
202402290839 02/29/2024 Sacramento Municipal Utility District comments on Annual policy initiatives roadmap process - 2024 - Discretionary policy initiatives catalog submission Comment/Response fileicon Process
202402290839 02/29/2024 Joint Demand Response Parties comments on Annual policy initiatives roadmap process - 2024 - Discretionary policy initiatives catalog submission Comment/Response fileicon Process
202402290839 02/29/2024 PG&E comments on Annual policy initiatives roadmap process - 2024 - Discretionary policy initiatives catalog submission Comment/Response fileicon Process
202402290839 02/29/2024 San Diego Gas & Electric comments on Annual policy initiatives roadmap process - 2024 - Discretionary policy initiatives catalog submission Comment/Response fileicon Process
202402290839 02/29/2024 Seattle City Light comments on Annual policy initiatives roadmap process - 2024 - Discretionary policy initiatives catalog submission Comment/Response fileicon Process
202402290838 02/29/2024 Public Generating Pool comments on Annual policy initiatives roadmap process - 2024 - Discretionary policy initiatives catalog submission Comment/Response fileicon Process
202402290838 02/29/2024 Joint LSEs comments on Annual policy initiatives roadmap process - 2024 - Discretionary policy initiatives catalog submission Comment/Response fileicon Process
202402290838 02/29/2024 California Department of Water Resources comments on Annual policy initiatives roadmap process - 2024 - Discretionary policy initiatives catalog submission Comment/Response fileicon Process
202402290838 02/29/2024 Terra-Gen, LLC comments on Annual policy initiatives roadmap process - 2024 - Discretionary policy initiatives catalog submission Comment/Response fileicon Process
202402290838 02/29/2024 Vistra Corp. comments on Annual policy initiatives roadmap process - 2024 - Discretionary policy initiatives catalog submission Comment/Response fileicon Process
202402290837 02/29/2024 CLECA comments on Annual policy initiatives roadmap process - 2024 - Discretionary policy initiatives catalog submission Comment/Response fileicon Process
202402290837 02/29/2024 PacifiCorp comments on Annual policy initiatives roadmap process - 2024 - Discretionary policy initiatives catalog submission Comment/Response fileicon Process
202402290837 02/29/2024 CESA comments on Annual policy initiatives roadmap process - 2024 - Discretionary policy initiatives catalog submission Comment/Response fileicon Process
202402290837 02/29/2024 GridStor comments on Annual policy initiatives roadmap process - 2024 - Discretionary policy initiatives catalog submission Comment/Response fileicon Process
202402290837 02/29/2024 Portland General Electric Company comments on Annual policy initiatives roadmap process - 2024 - Discretionary policy initiatives catalog submission Comment/Response fileicon Process
202402290837 02/29/2024 Southern California Edison comments on Annual policy initiatives roadmap process - 2024 - Discretionary policy initiatives catalog submission Comment/Response fileicon Process
202402290836 02/29/2024 Northern California Power Agency comments on Annual policy initiatives roadmap process - 2024 - Discretionary policy initiatives catalog submission Comment/Response fileicon Process
202402290836 02/29/2024 The Energy Authority comments on Annual policy initiatives roadmap process - 2024 - Discretionary policy initiatives catalog submission Comment/Response fileicon Process
202402290700 02/29/2024 Presentation - Transmission Service and Market Scheduling Priorities Phase 2 Training - Feb 27, 2024 Agenda/Presentation fileicon Initiative
202402290701 02/29/2024 Video - Transmission Service and Market Scheduling Priorities Phase 2 Training - Feb 27, 2024 Video fileicon Initiative
202402280904 02/28/2024 Northern California Power Agency comments on Resource adequacy modeling and program design - February 13, 2024 working group Comment/Response fileicon Initiative
202402280904 02/28/2024 Six Cities comments on Resource adequacy modeling and program design - February 13, 2024 working group Comment/Response fileicon Initiative
202402280903 02/28/2024 California Community Choice Association comments on Resource adequacy modeling and program design - February 13, 2024 working group Comment/Response fileicon Initiative
202402280903 02/28/2024 California Public Utilities Commission - Public Advocates Office comments on Resource adequacy modeling and program design - February 13, 2024 working group Comment/Response fileicon Initiative
202402280902 02/28/2024 California Department of Water Resources comments on Resource adequacy modeling and program design - February 13, 2024 working group Comment/Response fileicon Initiative
202402280902 02/28/2024 Middle River Power, LLC comments on Resource adequacy modeling and program design - February 13, 2024 working group Comment/Response fileicon Initiative
202402280900 02/28/2024 Pacific Gas & Electric comments on Resource adequacy modeling and program design - February 13, 2024 working group Comment/Response fileicon Initiative
202402280858 02/28/2024 California ISO - Department of Market Monitoring comments on Resource adequacy modeling and program design - February 13, 2024 working group Comment/Response fileicon Initiative
202402280858 02/28/2024 Alliance for Retail Energy Markets comments on Resource adequacy modeling and program design - February 13, 2024 working group Comment/Response fileicon Initiative
202309141148 09/14/2023 Presentation - Energy Storage Enhancements Track 2 Training Agenda/Presentation fileicon Initiative
202402271101 02/27/2024 Presentation - 2024-2025 Transmission Planning Process - Feb 28, 2024 Agenda/Presentation fileicon Process
202402271049 02/27/2024 Video - Greenhouse Gas Coordination Working Group - Feb 22, 2024 Video fileicon Initiative
202402201428 02/20/2024 Presentation - GHG Coordination Working Group - Feb 22, 2024 Agenda/Presentation fileicon Initiative
202402221620 02/22/2024 Vistra Corp. comments on Price formation enhancements - Scarcity sprint Comment/Response fileicon Initiative
202402211538 02/21/2024 Draft Study Plan - 2024-2025 Transmission Planning Process Papers, proposal, other documents fileicon Process
202402211057 02/21/2024 Rev Renewables comments on Price formation enhancements - Scarcity sprint Comment/Response fileicon Initiative
202402211057 02/21/2024 Bonneville Power Administration comments on Price formation enhancements - Scarcity sprint Comment/Response fileicon Initiative
202402211056 02/21/2024 Seattle City Light comments on Price formation enhancements - Scarcity sprint Comment/Response fileicon Initiative
202402211056 02/21/2024 Public Generating Pool comments on Price formation enhancements - Scarcity sprint Comment/Response fileicon Initiative
202402211054 02/21/2024 Southern California Edison comments on Price formation enhancements - Scarcity sprint Comment/Response fileicon Initiative
202402211054 02/21/2024 CESA comments on Price formation enhancements - Scarcity sprint Comment/Response fileicon Initiative
202402211054 02/21/2024 California ISO - Department of Market Monitoring comments on Price formation enhancements - Scarcity sprint Comment/Response fileicon Initiative
202402211054 02/21/2024 Calpine comments on Price formation enhancements - Scarcity sprint Comment/Response fileicon Initiative
202402211053 02/21/2024 Terra-Gen, LLC comments on Price formation enhancements - Scarcity sprint Comment/Response fileicon Initiative
202402211053 02/21/2024 WPTF comments on Price formation enhancements - Scarcity sprint Comment/Response fileicon Initiative
202402211053 02/21/2024 Middle River Power, LLC comments on Price formation enhancements - Scarcity sprint Comment/Response fileicon Initiative
202402211051 02/21/2024 California Public Utilities Commission - Public Advocates Office comments on Price formation enhancements - Scarcity sprint Comment/Response fileicon Initiative
202402211049 02/21/2024 PacifiCorp comments on Price formation enhancements - Scarcity sprint Comment/Response fileicon Initiative
202402211046 02/21/2024 California Community Choice Association comments on Price formation enhancements - Scarcity sprint Comment/Response fileicon Initiative
202402211046 02/21/2024 The Energy Authority comments on Price formation enhancements - Scarcity sprint Comment/Response fileicon Initiative
202402211046 02/21/2024 Boston Energy Trading and Marketing comments on Price formation enhancements - Scarcity sprint Comment/Response fileicon Initiative
202402211046 02/21/2024 Shell Energy comments on Price formation enhancements - Scarcity sprint Comment/Response fileicon Initiative
202402211046 02/21/2024 Pacific Gas & Electric comments on Price formation enhancements - Scarcity sprint Comment/Response fileicon Initiative
202402211046 02/21/2024 Six Cities comments on Price formation enhancements - Scarcity sprint Comment/Response fileicon Initiative
202402151007 02/15/2024 Proposed Schedule - Information Availability and Interconnection Study Process Papers, proposal, other documents fileicon Initiative
202402151000 02/15/2024 Draft Final Proposal - Interconnection Process Enhancements 2023 Track 2 Papers, proposal, other documents fileicon Initiative
202402131615 02/13/2024 Presentation - Interconnection Process Enhancements 2023 Track 2 - Feb 15, 2024 Agenda/Presentation fileicon Initiative
202402201101 02/20/2024 Video - Interconnection Process Enhancements 2023 Track 2 - Feb 15, 2024 Video fileicon Initiative
202402090803 02/09/2024 Presentation - 2025 Flexible Capacity Needs Assessment - Feb 12, 2024 Agenda/Presentation fileicon Process
202402160806 02/16/2024 Video - 2025 Flexible Capacity Needs Assessment - Feb 12, 2024 Video fileicon Process
202402091104 02/09/2024 Video - Extended Day-Ahead Market and Day-Ahead Market Enhancements Compliance Filing - Feb 6, 2024 Video fileicon Initiative
202402050908 02/05/2024 Draft Compliance Filing Language - Day-Ahead Market Enhancements and Extended Day-Ahead Market Papers, proposal, other documents fileicon Initiative
202402091057 02/09/2024 List of Qualified Project Sponsor Applications - North of SONGS to Serrano 500kV Transmission Line Project Papers, proposal, other documents fileicon Process
202402071548 02/07/2024 Jan 12, 2024 Tariff Amendment - Rules of Conduct Enhancements Phase 1 (ER24-872) Papers, proposal, other documents fileicon Initiative
202402061428 02/06/2024 Survey - Gas Resource Management - Working Group 7 Papers, proposal, other documents fileicon Initiative
202402060922 02/06/2024 Microsoft comments on Resource adequacy modeling and program design - January 16, 2024 working group Comment/Response fileicon Initiative
202401300752 01/30/2024 Presentation - Western EIM Regional Issues Forum Roundtable - Jan 30, 2024 Agenda/Presentation fileicon Process
202401261439 01/26/2024 Presentation - Policy Initiatives Catalog and Roadmap Process 2024 - Jan 30, 2024 Agenda/Presentation fileicon Process
202402051356 02/05/2024 Video - Policy Initiatives Catalog and Roadmap Process 2024 - Jan 30, 2024 Video fileicon Process
202402051044 02/05/2024 Draft Compliance Filing Language - Day-Ahead Market Enhancements and Extended Day-Ahead Market Papers, proposal, other documents fileicon Initiative
202402021325 02/02/2024 Clean Energy Buyers Association comments on Resource adequacy modeling and program design - January 16, 2024 working group Comment/Response fileicon Initiative
202401311237 01/31/2024 California Community Choice Association comments on Resource adequacy modeling and program design - January 16, 2024 working group Comment/Response fileicon Initiative
202401311237 01/31/2024 Pacific Gas & Electric comments on Resource adequacy modeling and program design - January 16, 2024 working group Comment/Response fileicon Initiative
202401311237 01/31/2024 Alliance for Retail Energy Markets comments on Resource adequacy modeling and program design - January 16, 2024 working group Comment/Response fileicon Initiative
202401311237 01/31/2024 California ISO - Department of Market Monitoring comments on Resource adequacy modeling and program design - January 16, 2024 working group Comment/Response fileicon Initiative
202401311236 01/31/2024 California Department of Water Resources comments on Resource adequacy modeling and program design - January 16, 2024 working group Comment/Response fileicon Initiative
202401311236 01/31/2024 Northern California Power Agency comments on Resource adequacy modeling and program design - January 16, 2024 working group Comment/Response fileicon Initiative
202401311236 01/31/2024 California Public Utilities Commission - Public Advocates Office comments on Resource adequacy modeling and program design - January 16, 2024 working group Comment/Response fileicon Initiative
202401311236 01/31/2024 Middle River Power, LLC comments on Resource adequacy modeling and program design - January 16, 2024 working group Comment/Response fileicon Initiative
202401311235 01/31/2024 Six Cities comments on Resource adequacy modeling and program design - January 16, 2024 working group Comment/Response fileicon Initiative
202401311235 01/31/2024 Silicon Valley Power comments on Resource adequacy modeling and program design - January 16, 2024 working group Comment/Response fileicon Initiative
202401311235 01/31/2024 Southern California Edison comments on Resource adequacy modeling and program design - January 16, 2024 working group Comment/Response fileicon Initiative
202312120947 12/12/2023 Revised Straw Proposal - Interconnection Process Enhancements 2023 - Dec 19, 2023 Papers, proposal, other documents fileicon Initiative
202401310814 01/31/2024 Joint Supplemental Comments - Interconnection Process Enhancements 2023 - Jan 30, 2024 Papers, proposal, other documents fileicon Initiative
202401301634 01/30/2024 Six Cities comments on Interconnection process enhancements 2023 - Revised straw proposal Comment/Response fileicon Initiative
202401301029 01/30/2024 Video - Gas Resource Management Working Group - Jan 25, 2024 Video fileicon Initiative
202401241538 01/24/2024 Presentation - Gas Resource Management - Jan 25, 2024 Agenda/Presentation fileicon Initiative
202401291543 01/29/2024 Notice of Decisional Classification - Postponement of Cluster 16 Interconnection Window - Feb 2023 Papers, proposal, other documents fileicon Initiative
202401221244 01/22/2024 Presentation - Price Formation Enhancements - Jan 24, 2024 Agenda/Presentation fileicon Initiative
202401291041 01/29/2024 Video - Price Formation Enhancements Working Group - Jan 24, 2024 Video fileicon Initiative